Server Room Budget Estimator
Room size, redundancy, raised floor, fire protection and cooling — get a ballpark budget range across every category before you scope a formal project.
1. Room & IT load
Typically a short bridge to generator, not all-night runtime.
2. Infrastructure & protection
Supply & fit, HPL finish, to FFH 150mm
Indicative project budget
—
One-time equipment & install estimate, excl. VAT
SLA support contract
—
Annual, recurring — not included in the one-time total above.
How this is calculated
UPS sizing follows the same engineering as the Backup Power Sizing calculator, scaled by a redundancy multiplier (N ×1.0, N+1 ×1.25, 2N ×2.0 — a standard industry approximation for module/string duplication).
Raised floor priced at ~R2,250/m² (derived from published 5–25m² tiered pricing). Fire protection and cooling use bracketed industry-typical ranges per tier — these vary the most by site and are the first line item to confirm with us directly.
SLA is estimated as a percentage of total equipment value per year (Standard 8%, Priority 12%, Mission-Critical 18%) — a common support-contract convention, not a fixed SNRG rate card.
All figures are indicative reference pricing (Sept 2026) for early-stage budgeting only — request a formal quote for exact numbers.